{"id":3319,"date":"2020-09-30T09:20:15","date_gmt":"2020-09-30T08:20:15","guid":{"rendered":"https:\/\/sofistik.uk\/?p=560"},"modified":"2022-12-13T10:26:06","modified_gmt":"2022-12-13T10:26:06","slug":"how-new-design-methods-lead-to-a-different-description-of-the-results-is-shown-by-using-the-example-of-two-cable-stayed-bridges-in-finland-and-vietnam","status":"publish","type":"post","link":"https:\/\/sofistikforyou.com\/how-new-design-methods-lead-to-a-different-description-of-the-results-is-shown-by-using-the-example-of-two-cable-stayed-bridges-in-finland-and-vietnam\/","title":{"rendered":"How new Design Methods lead to a Different Result Description"},"content":{"rendered":"\n
Written and presented at the SOFiSTiK Seminar 2018 by: In modelling of bridges for analyses or for construc\u00adtion, the quick development of the tools is changing the practices and workflows continuously. Applying new methods in design, producing a new format of deliverables and trying to fulfil old requirements will absolutely face challenges that recall for full rethin\u00adking. Thu Thiem 2 is a first major bridge to be built in Vietnam, where comprehensive information mo\u00addelling in design is applied in the country. Kruunu\u00advuori Bridge is a bridge designed to the client, that require maximal utilization of information modelling. Both are challenging cable-stayed bridges where new tools were adopted along the design process. Through these examples, the challenges and fu\u00adture expectations are highlighted from the bridge designer\u2019s point of view.<\/p>\n\n\n\n Thu Thiem 2 Bridge is a new crossing to be built over the Saigon River to connect the new Thu Thiem district to the city centre of Ho Chi Minh City in Vietnam. The Bridge location in the heart of a 10 million people metropolis, South Vietnam\u2019s financial capi\u00adtal, sets expectations for high quality, well recognizable and unique bridge. The Bridge is expected to become a symbol, not only to the related Thu Thiem district but also to the whole city. <\/p>\n\n\n\n The Bridge construction works have started in 2017.<\/p>\n\n\n
Atte Mikkonen, DI, Sillat, MSc, Bridges<\/a> | WSP, Finland <\/a><\/p>\n\n\n\nSummary<\/h2>\n\n\n\n
1 | Thu Thiem 2<\/h2>\n\n\n\n
Project\nbackground<\/strong><\/h3>\n\n\n\n